
Add to Cart
Business Scope
Main Equipment
No. | HDG Process | Equipment | Use |
1 | Pickling | Enclosed pretreatment workshop | Collect acid fume |
Acid fume treatment equipment | Environment friendly | ||
Pickling electric hoist/crane | Transfer | ||
2 | Rinsing | Waste water treatment equipment | Environment friendly |
3 | Degreasing | Waste heat recycling system | Save energy |
4 | Rinsing | Waste water treatment equipment | Environment friendly |
5 | Fluxing | Waste heat recycling system | Save energy |
Iron removal equipment | Recycling | ||
6 | Galvanizing | Galvanizing fumacebody | For heating |
Zinc kettle | Place zinc | ||
White fume fixed hood | Collet fume | ||
White fume treatment equipment | Envronment friendly | ||
Bridge crane/ electric hoist | Transfer | ||
7 | Cooling | Cooling tower | Recycling |
8 | Passivation | Chromium- firee passivator | Good effect |
9 | Auxiliary | Bridge crane/Flat trolley/Material rack/ Transfer pit | Transfer |
Tank's anti- corrosion protection | Safety | ||
Zinc ingot/Chemicals/ Alloy | Necessity |
Description of Advanced Hot Dip Galvanizing Technology
products from the aspects of intelligent and digital control technology development.
To highlight the advanced nature of our company’s hot dip galvanizing technology.
here mainly introduces the use of a digital control system which is a worldwide new technology.
galvanizing processes. And the data can show on your smartphone.
Even if you are far from your factory can see the running status by checking the APP on your phone.
the digital control system minimizes manual mistakes, and the quality of galvanized products is ensured.
About Intelligent Hot Dip Galvanizing Line
control to realize high-quality production.
they can enter the fixed hood for galvanizing, the operator triggers the automatic galvanizing signal to
realize the automatic operation.
HDG Production Line Project Equipment List
No. | Process | Detail | How | Equipment |
1 | Conceptual design | Demand communication | E-mail/Wechat/Tel. | Computer |
Custom plant | 3D plant layout | 3D max | ||
Site visit | VR Pre-viewing | VR equip. | ||
Confirm project | Sign the contract | Computer | ||
2 | Manufacture | Prepare material | Import& locally | CNC |
Control system programming | PLC | Computer | ||
3 | Installation | Transfer to factory | Transportation | Truck/ship |
Install equipment | Follow the design | Crane | ||
4 | Commission-ing | Test running | Auto combustion system | Computer |
Technical support | Gal. know-how | Instrument | ||
5 | After-sales service | Checking running state | System data | Computer/APP |
On-time troubleshooting | Solve problems | Tel./video/ |